介绍我国煤矿巷道锚杆支护技术的发展过程,分析预应力锚杆支护作用机理与影响因素,确定锚杆预应力设计的原则是控制围岩不出现明显离层与拉应力区,得出不同锚杆的预应力取值范围,分析影响锚杆预应力的主要因素。论述预应力锚杆与锚索对支护材料的要求,介绍高强度、高延伸率锚杆与锚索材料力学性能,高预应力施加方法与机具。最后,介绍预应力锚杆与锚索支护在复杂困难巷道中的应用,包括支护形式与支护效果。指出预应力锚杆与锚索支护,必要时进行注浆加固,是一种复杂困难巷道有效的支护形式。
Abstract:By introducing development procedure of anchored bolt supporting in China and analyzing action mechanism and influence factors of pre-stress anchored bolt,principle of anchored bolt supporting design was confirmed that there was no obvious separation and tension stress area in surrounding rock.Pre-stress value range of different anchored bolt was obtained and main factors influencing pre-stress were analyzed.Requirement of pre-stress anchored bolt and rope for supporting material was discussed.Mechanical properties of anchored bolt with high strength and high extension ratio,and pre-stress forcing method and instrument were introduced.Application of pre-stress anchored bolt and rope supporting in roadway with complex conditions including supporting model and effect was introduced.Pre-stress anchored bolt and rope,adding grouting for reinforcement if necessary,was an effective supporting manner for roadway with complex conditions.
[1]侯朝炯,郭励生,勾攀峰.煤巷锚杆支护[M].徐州:中国矿业大学出版社,1999.
[2]王金华.我国煤巷锚杆支护技术的新发展[J].煤炭学报,2007,32(2):113-118.
[3]康红普,王金华.煤巷锚杆支护理论与成套技术[M].北京:煤炭工业出版社,2007.
[4]SONG G,STANKUS J.Control mechanism of a tensioned bolt sys-tem in the laminated roof with a large horizontal stress[A].The16th Int.Conf.on Ground Control in Mining[C].Morgantown,West Virginia,[s.n.],1997:167-172.
[5]康红普,王金华,林健.高预应力强力支护系统及其在深部巷道中的应用[J].煤炭学报,2007,32(12).
[6]康红普,姜铁明,高富强.预应力在锚杆支护中的作用[J].煤炭学报,2007,32(7):673-678.
[7]康红普,林健,吴拥政.全断面高预应力强力锚索支护技术及其在动压巷道中的应用[J].煤炭学报,2009,34(9):1153-1159.
[8]王金华.千米深井煤巷围岩变形特征及其控制技术研究[D].北京:中国矿业大学,2007.
[9]孙玉福.潞安矿区动压影响巷道锚杆支护技术及应用[D].北京:煤炭科学研究总院,2010.
[10]曹晨明.松软破碎硐室群围岩应力分布及加固技术研究[D].北京:煤炭科学研究总院,2009.
基本信息:
DOI:10.13532/j.cnki.cn11-3677/td.2011.03.010
中图分类号:TD353.6
引用信息:
[1]康红普.煤矿预应力锚杆支护技术的发展与应用[J],2011,16(03):25-30+131.DOI:10.13532/j.cnki.cn11-3677/td.2011.03.010.
基金信息:
国家科技支撑计划项目:大断面煤巷锚杆支护技术与材料研发(2008BAB36B07)